Grid operator
28/10/25
What if network operators could easily switch to Eplan as their engineering platform?

The sheer volume of data is preventing many grid operators from testing new methods in the engineering of substations. The changeover, however, will be inevitable – otherwise, grid expansion will not be manageable. However, there is good news: a...

23/03/21 BIM in Building Automation - The Right Connection Is Everything 17/03/21 Automation Concern Four – 'Nobody makes automated machinery for building... 23/02/21 Automation Concern Three – 'The benefits of automation in panel building are... 2/02/21 Automation Concern Two – 'Automation is too expensive for us to contemplate.' 12/01/21 Automation Concern One – 'We can’t automate panel design because almost every...

It’s true, a lot of the time control panels are one-offs. However, even the most unique control panels contain fixed or...

15/12/20 The top 5 blogs of 2020!